Radon membranes are often seen as an impermeable barrier that prevents radon entering a building. In reality, no membrane will completely prevent radon ingress. Performance depends on the material, thickness, installation quality and conditions on site.
Membranes marketed for radon protection vary in their properties. A technical datasheet or product certificate alone does not demonstrate that a membrane will provide sufficient protection in every situation. Its suitability needs to be considered in the context of the site and the building design.
What does UK guidance say?
BRE’s BR 211: Radon – Guidance on protective measures for new buildings (2023) refers to a gas-tight membrane as providing basic radon protection. It advises that a membrane of 400 microns or above may be appropriate, depending on the construction conditions identified by the design, and gives a typical radon transmission rate for a radon-resistant membrane.
However, BR211 also indicates that the robustness of a gas-resistant membrane can be more critical to its performance than permeation. A thicker, more durable product may be less vulnerable to construction damage and could still provide a suitable solution even if it has a higher permeation value. Any alternative should be supported by an appropriate assessment.
The key point is that a membrane should not be selected on thickness or a single performance figure alone.
Assessing suitability for the site
NHBC (2023) Hazardous Ground Gas guidance indicates there is no limiting diffusion coefficient value for radon the radon diffusion coefficient should be combined with the thickness of the product to give a radon transmission rate which should then be suitable for the likely radon concentrations that could be present in the ground at a particular site.
A site-specific assessment can help determine whether a membrane will provide sufficient attenuation. This involves considering the material’s radon diffusion properties alongside its thickness and the likely radon concentrations beneath the building. The effects on radon attenuation can also be considered where ventilation is provided.
Such assessments can be challenging because radon concentrations in ground are not routinely measured in the UK. Nevertheless, understanding the potential source and the building design is important when selecting appropriate mitigation measures. EPG can undertake soil radon monitoring to help inform the risks.
Why installation matters
Even small defects can significantly increase radon ingress. Gaps, cuts and poorly sealed joints could allow radon to migrate through pressure-driven flow, bypassing the protection provided by the membrane material itself.
Installation, inspection and verification are therefore essential. The membrane must remain continuous and properly sealed around joints and service penetrations, and measures should be taken to prevent damage during and after construction.
The role of the building floor
A concrete floor can provide additional attenuation alongside a membrane. In some circumstances, a well-constructed and sealed floor may contribute significantly to reducing radon ingress.
However, potential pathways must be considered. Service penetrations and unsealed joints in concrete floors can allow gases to migrate into a building, particularly where the membrane is damaged or discontinuous.
Additional considerations for basements
Basements, cellars and underground structures should be treated with particular care. The UK Health Security Agency advises that radon maps should not be used to assess these locations, as they should be considered at increased risk regardless of their location.
Below-ground structures have a larger surface area in contact with the ground and may be closer to the radon source. Where a structure is in direct contact with groundwater, the potential for radon in groundwater may also need to be assessed especially where cavity drains are present or proposed.
Taking a site-specific approach
Low-permeability membranes can be an effective part of radon protection, but they do not guarantee that radon will be completely excluded from a building. Their performance depends on the properties of the material, the conditions on site, the quality of installation and the prevention of subsequent damage.
A site-specific assessment can help justify the selection of appropriate mitigation measures, taking account of the likely radon source, building design and the performance of the proposed system. A design report should be prepared to support the selection of protection measures which should include detailed design drawings and verification plan.
At EPG, we can help assess ground gas risks including radon and provide technical advice to support the selection of appropriate protection measures for individual sites. Talk to us about your next project.
A thought leadership article authored by Alwyn Hughes, Head of Structural Waterproofing for EPG

Over many years, one of the recurring frustrations we see is how often clients are left with waterproofing “designs” that offer little more than broad narrative, lacking the detail a contractor needs in the trench. That gap between design intent and site execution is where risk, shortcuts and failures lurk.
Here’s what too many waterproofing reports get wrong, and how the industry standards expect better.
The problem? Words without usable drawings
Designers often bury generic descriptions, product data sheets, or typical details in 50 pages of narrative, leaving installers to hunt for critical information and frequently find it missing.
As a result, on site people must “fill in the blanks” by guesswork. How do membranes interface at service penetrations, around slab edges, beneath raised slabs, in internal box-outs, or at expansion joints? Which layer laps over which? What tolerances/movements are permitted?
That ambiguity leads to shortcuts, improvisation, and, ultimately, failure.
In contrast, a proper waterproofing design isn’t just a report. It must be followed by a project-specific package of drawings including but not limited to layout plans, cross-sections, and detail interfaces showing exactly how the waterproofing system, its ancillaries, and structure interrelate.
What the standards demand (and what’s being ignored)
BS 8102:2022
The revised standard reinforces that a waterproofing specialist should be part of the design team from the early stages. The scope is expanded: ingress from sources beyond groundwater (e.g. flood, surface water, through openings) must be considered.
It continues to define three protection types Type A (barrier), Type B (structurally integral), Type C (drained) and allows combinations thereof, subject to compatibility, to meet the project’s environmental grade.
The standard explicitly recognises that defects are inevitable. Repairability and maintainability must be built into the system from the outset. Importantly, BS 8102:2022 places greater emphasis on the construction phase and expects designers and contractors to maintain communication as changes occur.
Yet I often see “BS 8102-compliant” design reports that lack the very drawings and interface clarity that the standard presumes will exist.
NHBC Chapter 5.4 – “Waterproofing of basements and other below ground structures”
Chapter 5.4 is NHBC’s go-to when assessing waterproofing in warranty projects.
It sets out that waterproofing design must be rigorous and capable of preventing ingress from ground water and other sources, for all elements (walls, slabs, foundations). The chapter emphasises provision of information. Design documents, drawings and specifications must be clear, coordinated, and communicated to all relevant parties (site teams, sub-contractors, suppliers).
NHBC also expects continuity of waterproofing across junctions (e.g. between DPC, DPM, tanking) and that details of penetrations, insulation, junctions, trench fill, service entries etc. are included in the design.
I’ve lost count of the times a client asked, “where in the design does it show the detail of the seal at the pipe penetration, or how the slab membrane laps to the wall membrane?” and the answer is, nowhere. That’s a major red flag under NHBC scrutiny.
PCA / Industry Guidance
The Property Care Association’s guidance and codes (especially for existing structures) call for full system design, specification of interfaces and risk assessment.
Best-practice publications (e.g. on Type C systems) emphasise that continuity, detailing and coordination of ancillary products are as critical as the membrane itself.
What good looks like (and what we at EPG demand)
When we accept a waterproofing design commission or take over a responsibility, our minimum requirements are:
- Full design drawings
- Plan showing waterproofing extents and transitions
- Sections and details showing all interfaces (membrane to structural elements, membranes to penetrations, to insulation, junctions and terminations either at DPC level or between alternate graded areas)
- Layouts showing drainage routing, sump, pumps, falls, access points
- If a dual or hybrid system is used, the sequencing and mechanical compatibility must be explicit
- Clear hierarchy of laps, overlaps, tolerances, movement joints
Maintainability / repair strategy
Where water might reach the void, how it will be collected and removed (particularly in Type C systems)
- How repairs or diagnostic measures would be carried out mid-life
- Coordination package
- Interfaces with structural, services, drainage, insulation designers
- Site reference levels, levels of fittings, site tolerances
- Design responsibility and warranty
- A named designer with accountability
- A design warranty (or retrospective assumption when called in)
If you’re a client or project lead, ask your waterproofing ‘designer’ if their deliverables include the above. If their answer is “we’ll leave that to the contractor,” you’re walking into risk.
Why these matter
Without proper drawings, contractors are forced to guess or improvise. That’s where weak spots go unnoticed until water finds them.
Defects in waterproofing are expensive, disruptive, and often hidden until long after handover.
Clients often assume the original designer holds responsibility; but too often they discover there is no one accountable, and then we (EPG) are asked to salvage design and liability post installation.
The industry must raise the bar. We should call out, not people but deficient practices. We need to flush out those who advertise themselves as “experts” or “specialists” but don’t deliver real, installable design.
If you’re in the waterproofing supply, contracting, or client side, demand clarity, demand drawings, demand accountability. Let’s quit tolerating “report-only” designs that leave the site to fend for itself.
Find out more about our structural waterproofing service HERE
You might also be interested in

Beyond BS 8102: Why Basement Waterproofing Should Be Done Right the First Time
BS 8102:2022 – Protection of Below Ground Structures Against Water Ingress offers guidance on basement waterproofing in the UK. A key requirement of the standard is the need for the waterproofing system to be repairable in the event of failure.
Find out more
EPG expands environmental expertise through acquisition of Hafren Water
The Environmental Protection Group (EPG) is pleased to announce the acquisition of Hafren Water, a respected environmental consultancy specialising in hydrology and hydrogeology services. This acquisition marks another exciting milestone in EPG’s continued growth, with Hafren Water’s hydrogeology expertise complementing EPG’s existing services.
Find out more
Type C vs. Type A Waterproofing: Convenience Over Quality?
BS 8102:2022 identifies three types of structural waterproofing: Type A (barrier or membrane protection), Type B (structurally integral systems, typically using watertight concrete), and Type C (internal cavity drainage systems).
Find out more
Over many years, one of the recurring frustrations we see is how often clients are left with waterproofing “designs” that offer little more than broad narrative, lacking the detail a contractor needs in the trench. That gap between design intent and site execution is where risk, shortcuts and failures lurk.
Here’s what too many waterproofing reports get wrong, and how the industry standards expect better.
The problem? Words without usable drawings
Designers often bury generic descriptions, product data sheets, or typical details in 50 pages of narrative, leaving installers to hunt for critical information and frequently find it missing.
As a result, on site people must “fill in the blanks” by guesswork. How do membranes interface at service penetrations, around slab edges, beneath raised slabs, in internal box-outs, or at expansion joints? Which layer laps over which? What tolerances/movements are permitted?
That ambiguity leads to shortcuts, improvisation, and, ultimately, failure.
In contrast, a proper waterproofing design isn’t just a report. It must be followed by a project-specific package of drawings including but not limited to layout plans, cross-sections, and detail interfaces showing exactly how the waterproofing system, its ancillaries, and structure interrelate.
What the standards demand (and what’s being ignored)
BS 8102:2022
The revised standard reinforces that a waterproofing specialist should be part of the design team from the early stages. The scope is expanded: ingress from sources beyond groundwater (e.g. flood, surface water, through openings) must be considered.
It continues to define three protection types Type A (barrier), Type B (structurally integral), Type C (drained) and allows combinations thereof, subject to compatibility, to meet the project’s environmental grade.
The standard explicitly recognises that defects are inevitable. Repairability and maintainability must be built into the system from the outset. Importantly, BS 8102:2022 places greater emphasis on the construction phase and expects designers and contractors to maintain communication as changes occur.
Yet I often see “BS 8102-compliant” design reports that lack the very drawings and interface clarity that the standard presumes will exist.
NHBC Chapter 5.4 – “Waterproofing of basements and other below ground structures”
Chapter 5.4 is NHBC’s go-to when assessing waterproofing in warranty projects.
It sets out that waterproofing design must be rigorous and capable of preventing ingress from ground water and other sources, for all elements (walls, slabs, foundations). The chapter emphasises provision of information. Design documents, drawings and specifications must be clear, coordinated, and communicated to all relevant parties (site teams, sub-contractors, suppliers).
NHBC also expects continuity of waterproofing across junctions (e.g. between DPC, DPM, tanking) and that details of penetrations, insulation, junctions, trench fill, service entries etc. are included in the design.
I’ve lost count of the times a client asked, “where in the design does it show the detail of the seal at the pipe penetration, or how the slab membrane laps to the wall membrane?” and the answer is, nowhere. That’s a major red flag under NHBC scrutiny.
PCA / Industry Guidance
The Property Care Association’s guidance and codes (especially for existing structures) call for full system design, specification of interfaces and risk assessment.
Best-practice publications (e.g. on Type C systems) emphasise that continuity, detailing and coordination of ancillary products are as critical as the membrane itself.
What good looks like (and what we at EPG demand)
When we accept a waterproofing design commission or take over a responsibility, our minimum requirements are:
- Full design drawings
- Plan showing waterproofing extents and transitions
- Sections and details showing all interfaces (membrane to structural elements, membranes to penetrations, to insulation, junctions and terminations either at DPC level or between alternate graded areas)
- Layouts showing drainage routing, sump, pumps, falls, access points
- If a dual or hybrid system is used, the sequencing and mechanical compatibility must be explicit
- Clear hierarchy of laps, overlaps, tolerances, movement joints
Maintainability / repair strategy
Where water might reach the void, how it will be collected and removed (particularly in Type C systems)
- How repairs or diagnostic measures would be carried out mid-life
- Coordination package
- Interfaces with structural, services, drainage, insulation designers
- Site reference levels, levels of fittings, site tolerances
- Design responsibility and warranty
- A named designer with accountability
- A design warranty (or retrospective assumption when called in)
If you’re a client or project lead, ask your waterproofing ‘designer’ if their deliverables include the above. If their answer is “we’ll leave that to the contractor,” you’re walking into risk.
Why these matter
Without proper drawings, contractors are forced to guess or improvise. That’s where weak spots go unnoticed until water finds them.
Defects in waterproofing are expensive, disruptive, and often hidden until long after handover.
Clients often assume the original designer holds responsibility; but too often they discover there is no one accountable, and then we (EPG) are asked to salvage design and liability post installation.
The industry must raise the bar. We should call out, not people but deficient practices. We need to flush out those who advertise themselves as “experts” or “specialists” but don’t deliver real, installable design.
If you’re in the waterproofing supply, contracting, or client side, demand clarity, demand drawings, demand accountability. Let’s quit tolerating “report-only” designs that leave the site to fend for itself.
Find out more about our structural waterproofing service HERE

Myth: There is no point paying for independent specialists to design my gas protection system when the product supplier can give me a design for free!
Free designs from suppliers can lack independence and site-specific context. Using an impartial, qualified specialist ensures the design is appropriate, risk-based, and fully accountable.
If you ask a supplier to specify the products – at best you are handing them a blank cheque to over-spec the job, and at worst you’ll end up with a design that doesn’t work, and no-one to hold to account.
An independent design will include a full review of the site investigation data and gas regime on the site. We will design-out the gas protection if we can, and provide the most cost-effective design for the risk-profile of the site. Our designs include a set of site-specific drawings and construction details to allow site certainty and confidence in what is required to be installed and verified. The design report will specify the products to be used in the design and ensure these are compatible with the construction methods, structural waterproofing requirements, and gas regime for the site. All of this is backed by our contaminated land risk assessment and gas and water mitigation design expertise, and professional indemnity insurance. Advice you can trust – than we will stand by.
Would you trust the car salesman to tell you which car to buy? Or ask an estate agent how to build a house?

Myth: Pressure relief is needed (as a minimum) for all gas protection designs
BS8485 indicates that as a minimum all gas protection systems should include at least pressure relief for gases which might otherwise build up under the building, in reality for low gas risk situations (CS2) the flow of gas from the ground is sufficiently low so that pressurised gas will not accumulate below the building.
A pressure relief pathway should be considered for CS3 and above for sites where underfloor ventilation is not included. Pressure relief systems are often overdesigned. Pressure relief pathways should consider the flow of gas from the ground which could potentially accumulate below a building and provide sufficient flow capacity so pressurisation will not occur. They do not need to keep gas below a design concentration.
High concentrations can accumulate in pressure relief systems – but the gas shouldn’t be under pressure. The sub-base under the slab if often sufficient on it’s own.
Do you see pressure relief systems in every gas protection design?

Myth: VOC membranes stop ingress of VOCs
Membranes do not stop vapour intrusion completely. All membranes have transmission rates for different contaminants, VOC membranes (if properly installed and verified) will slow down ingress of certain vapours. Depending on the levels of contamination on the site, the contaminant(s) of concern, and the form of construction it may not be enough to mitigate the risk. In particular where free product is close to the building or in direct contact with VOCs in groundwater.
The performance of VOC membranes can vary significantly between products. Inclusion of any VOC membrane in a design MUST be backed by a suitably detailed vapour intrusion risk assessment.
To inform the vapour intrusion assessment you need VOC permeation data for your membrane that you can trust. Terminating permeation tests early doesn’t allow for “break-through” of contaminants and can give a false impression of the diffusion rate. That’s why at EPG we want to see the full test results to verify the shape of the curve and confirm the published permeation data is representative. We might even send samples for testing as part of the verification, if it’s crucial to the integrity of our design.
Thickness will also affect membrane performance. Checks should be undertaken during installation to ensure the thickness is consistent with the assumptions used in the risk assessment as it can be less than shown on product datasheets increasing vapour permeation.
As designers we have a responsibility to ensure that the products being specified are suitable and not just accept the information provided.
How often are we calling for a VOC membrane without fully quantifying the risk? Or relying on them to stop ingress entirely? Is this ever an acceptable approach?

Myth: 0.4mm thick gas resistant membranes are suitable under a warehouse
In our designs we require gas membranes under cast in-situ concrete to be at least 0.5mm thick (between any reinforcement scrim) and free from aluminum foil.
Not all gas protection membranes are the same! They vary in terms of the materials they are made of, thickness, levels of reinforcement – and if they are bonded (integral link to cast in-situ concrete) or self-adhesive.
Membrane suitability depends on the site-specific risk, construction sequence and durability. Under a large cast in-situ warehouse slab, thin membranes and those with an aluminum foil core are likely to be damaged by the construction process. Taped seams are also unlikely to be durable enough.
A thin composite membrane might have a low gas transmission rate and be easy to work with on site for detailing – but all that’s no good if it gets ripped, punctured, or suffers chemical attack during construction of the floor.
How often do you see membranes >0.4mm being specified for gas protection?
Have you ever seen evidence of a membrane being damaged after it’s been laid and verified?

Myth: Gas membranes need to comply with BS8485
BS8485 is a Code of Practice for designers to use when specifying appropriate gas protection products, it includes guidance for competent professionals to use to inform their designs. It is not a specification and a product cannot comply with a Code of Practice, so a membrane cannot comply with BS8485.
Specification of the right gas resistant membrane and ancillary products requires a full understanding of the ground gas regime and other design considerations. A competent designer asks all these questions (amongst others):
- What is the bulk gas regime? (CS classification) And is there also a radon risk and/or vapour intrusion to consider?
- Where is the membrane placed, above or below the floor?
- Is there the potential for chemical attack of the membrane from curing concrete or contact with soil contamination?
- How does the gas protection integrate with structural waterproofing and damp proofing requirements?
- How will the membrane be detailed at edges, joins, penetrations, level changes, etc., and is it sufficiently flexible for the detailing required?
- Are there compatible products available to achieve a continuous gas resistant layer across the full footprint of the building (self-adhesive, sealants, liquid applied)?
- What stresses and strains will it come under during construction, is it robust enough and do I need to specify protection layers?
- Is there the potential for ground settlement or heave?
- Does the design life of the structure require joins to be welded rather than taped, are there other reasons welded joins could be required, e.g. VOCs?
- Could a more robust membrane with a higher gas transmission rate be suitable for the development where mitigation is also provided by the structure?
At EPG, we provide a comprehensive independent gas protection design service, in accordance with the BS8485 Code of Practice, but also backed up by a wealth of experience in this area. We understand that clients and developers want things to be simple, unfortunately gas protection design isn’t as simple as some manufacturers or installers would like you to believe – but with EPG on board, we can ask all the questions for you – and provide you with a site-specific design that can you can rely on.
Have you seen a claim that a membrane complies with BS8485?

Myth: Ground gas from shallow coal workings can be easily fixed with just a gas membrane, and if the ground investigation doesn’t find any gas I won’t even need that.
Risk assessment for emissions from coal mine workings requires a full understanding of all the potential pathways for gas and possible future changes. It’s generally more complex than gas flux from biogenic sources (landfill/Made Ground) because there is more potential for preferential pathways and accumulation of large volumes of gas in voids in the ground. Keep in mind these key points:
- It’s easy to miss mine workings when boreholes are widely spaced.
- Information about groundwater levels and how they change over time is key to determining if there is a risk. Flooded workings cannot generate or store gas!
- Spot monitoring can easily miss short duration significant gas fluxes – consider using continuous methods instead. And even then, the response zones and monitoring period needs to be designed right to be robust.
- Gas flux modelling calculations are required to design protection measures for coal mine gas emissions – you cannot use BS8485 unless you have a very low risk conceptually.
- Some high risk mine gas sites won’t be suitable for residential development.
If you have shallow unflooded coal workings or a shaft linked to workings on or very close to your site WATCH OUT: absence of gas during a short monitoring period does not mean a site is risk-free.
Check out the CL:AIRE guidance for more detail HERE or the SoBRA webinar Introduction to Coal Mine Gas Risk Assessment and Protection Design by Head of Geoenvironmental, Amy Juden HERE
Do you find site investigation and monitoring for coal mine gas challenging?

Myth: Barometric pressure is always a key driver for bulk ground gas risk
Barometric pressure can influence bulk gas movement, but is not always the dominant factor. Site geology, source strength, and construction type are also critical in understanding gas behaviour.
Soil and Type 1 sub-base have two key properties that limit the influence of pressure drops to a very small depth below a floor slab – friction to flow (head loss) and entry pressure. Testing by EPG has shown that the zone of influence from pressure drops will only extend at most 500mm below the slab and probably less than that. That is not enough to draw sufficient gas out of soils to pose a risk. This means that unless there is a large open source and an open pathway into the building then barometric pressure has minimal if any influence on gas movement into the building. Gas emissions at sites over Made Ground with a low organic content or over Alluvium will not be affected by barometric pressure changes.
Have you assessed whether changes in gas concentration in a monitoring well are due to oxygen flowing into the ground and diluting static gas rather than an increase in gas flow from the ground? Are any correlations with barometric pressure simply due to the presence of the monitoring well and do not reflect what is happening in the surrounding ground? Barometric pressure drops often coincide with rainfall which can be the actual driver.
A common myth is that falling atmospheric pressure sucked gas out of the landfill site at Loscoe and caused the methane ingress into a house that exploded. This is not correct. The gas slowly diffused into a pit in the garden that was connected to the house via a pipe and the pressure drop sucked the gas that had accumulated in the pit via an open pathway into the house. The same mechanism occurred with carbon dioxide at a site in Gorebridge in Scotland where gas accumulated below the floor slab in stone columns and pressure drops sucked it from there.
Do we focus too much on barometric pressure conditions? Should we spend a bit longer on the CSM and ingress pathways instead? Do you consider when barometric pressure drops are a risk driver for ground gas, and when they are not?

Myth: Gas risk assessment in accordance with BS8485 is as easy as multiplying two numbers together and adding up points! Anyone can do it!
Gas risk assessment requires professional judgement. BS8485 includes a scoring system, but using it effectively demands understanding of site-specific factors, geology, and gas behaviour.
The gas screening value (GSV) in BS8485 is not calculated – it is derived based on professional judgement and a full understanding of the site conceptual model, gas sources, pathways and data quality assessment. Hazardous gas flow rates are calculated per monitoring well, per monitoring event – and are not the same as the GSV.
We also often see misapplication of BS8485, when the data quality assessment is missing, data from deep or flooded wells is used, where response zones cross-strata or where there is no consideration of the source of the gas in the ground.
While CIRIA C665 may provide some useful background guidance on how to do a risk assessment, watch out – the definition of a GSV has changed! Be aware of the difference – BS8485 is the current Code of Practice that should be used.
A GSV should not be used for existing buildings or on its own to consider coal mine gas risks.
The scoring system for gas protection design in BS8485 provides a generic framework for determining the scope of protection measures, based on the bulk gas regime or characteristic situation (CS2, CS3, CS4, etc.). But producing a full design involves a greater understanding of the proposed development, risk, and an ability to check and verify the findings and recommendations of site investigation reports.

Myth: Gas monitoring wells do not need designing
Gas monitoring wells should be designed on completion of the hole, based on the strata and groundwater encountered. Response zones should be designed so that they are above the groundwater table and isolated into a single stratum that is either a pathway or source of gas that could pose a hazard.
Designing a site investigation – ensure that there is supervision and flexibility to allow design of individual response zones on completion of each borehole. Make sure that the response zones are suitable for the risk assessment method you are adopting.
Not all gas monitoring data can be used to determine the worst case gas screening values (GSVs) – flow rate and gas concentration has to be from the same stratum as defined in BS8485.

Myth: Every ground investigation on brownfield land has to include gas monitoring
Not all brownfield sites require gas monitoring. The decision should be based on a robust preliminary risk assessment and Conceptual Site Model. Whilst on some sites it’s absolutely required – unnecessary monitoring can waste time, resources, and carbon.
Gas monitoring in natural superficial deposits often leads to elevated CO2, which doesn’t pose a risk of hazardous emissions but is often misinterpreted. If wells are installed in Alluvium, the likelihood is that they become flooded and any data is not representative – i.e. useless!
If the only viable source is urban Made Ground, are you better off doing organic carbon testing on the soil? (see CL:AIRE RB17)
Or installing a groundwater monitoring well and collecting gas monitoring data from it, just because it’s present? Perhaps gas monitoring for a road or rail schemes, where there is no receptor? We see this kind of thing all the time, and it’s frustrating.
Follow this golden rule: Gas monitoring should only ever be in the gas source (in the unsaturated zone) or in a permeable (unsaturated) pathway between the source and the receptor. If you are doing anything else, STOP. (More on monitoring well response zones coming up on the MythBusters!)
What do you think? How often do you design out gas monitoring from your site investigation?

You might also be interested in
Opinion Piece:
Steve Wilson and Dr Jacqueline Diaz-Nieto discuss the alternatives to BRE 365 infiltration tests and whether testing is required when a desk based study clearly shows infiltration will not be possible.

Introduction
Imagine a proposal for a new infiltration test method that comprises filling a deep pit, of roughly estimated dimensions, with water, taking no account of wall collapse and spalling during the test, analysing the results without consideration of soil stratigraphy in the pit, is wasteful in resources such as water and gravel to fill pits and is a method considered dangerous. It would not be considered acceptable, so why does the drainage industry and Lead Local Flood Authorities continue to think that BRE 365 infiltration tests are an acceptable approach when much safer and reliable methods of infiltration tests are available? These other test methods are also especially suitable for infiltration via sustainable drainage systems?
Recent articles in AGS newsletters (AGS 2021 and 2024) have discussed the concerns of the AGS safety working group about the safety of general trial pitting methods and BRE 365 infiltration tests. In order to overcome the safety concerns tests are increasingly carried out using coarse gravel to fill the pit. This provides practical problems and also introduces concerns about the sustainability of waste gravel (in addition to the existing one of water use).
The current BRE 365 test method was first published in 1991 (BRE 1991) and the infiltration test method it describes has not changed since then (despite revisions to the document in 2003 and 2016). CIRIA Report 156 (CIRIA 1996) did propose some amendments to the test (for example it recommends that the depth of water should be comparable to that likely to occur in the infiltration system and also if soil conditions vary across a site the tests should be undertaken at 10m spacings) but this document is rarely referred to.
At the time BRE 365 was first published infiltration systems were essentially limited to soakaways that cover a small area and are relatively deep. They were also only normally used to drain small areas.
Properly designed SuDS require shallow infiltration devices dispersed around a site rather than a single large soakaway at the end of a piped drainage system. For these types of system the BRE 365 test is not suitable. Even for small single soakaways managing runoff from small roof catchments there are better ways than BRE365 to assess infiltration rates. There are often significant issues with the application of the test method and analysis of the results, as well as no assessment of surrounding ground conditions.
The industry should move from infiltration “testing” to infiltration “assessment”, because determining an infiltration rate is more than just pouring water into a hole. The ground model needs careful consideration and a full assessment using other test methods will give a better overall indication of the infiltration rate of the soil than a BRE 365 test on its own. In the ideal SuDS scenario many small tests in conjunction with good understanding of the ground model are better than a few large scale BRE tests used in isolation.
A further concern is the unnecessary and unreasonable requirement from some Lead Local Flood Authorities (LLFAs) for infiltration tests to be completed to demonstrate infiltration is not possible.
The BRE 365 test
The BRE365 test is not particularly accurate for a number of reasons (See Figure 1). There is also often scant regard paid to ground conditions when interpreting results. The dimensions of trial pits in practice are rarely, if ever, perfectly rectilinear and where gravel infill is used the porosity is often assumed rather than measured. However, such theoretical issues and the resulting variations in infiltration rate are not normally the cause of soakaway or infiltration system failure.
The most common cause of failure is that little, if any, attention has been paid to the overall ground model when designing an infiltration test programme and interpretating the results. Tests are often carried out by unqualified staff without any understanding of the ground model and there are often no robust soil descriptions provided.

Figure 1. Infiltration testing – theory and practice
The importance of the ground model is recognised in BRE 365 which requires “Examining site data to ensure that variations in soil conditions, areas of filled land, preferential underground seepage routes, variations in the level of groundwater, and any geotechnical and geological factors likely to affect the long-term percolation and stability of the area surrounding the soakaway”. Unfortunately, this aspect of the design and testing is often ignored.
The main causes of soakaway failures that are ground related (rather than poor construction or other non-ground related design issues) are all related to poor understanding of ground conditions, poor design of the testing or poor analysis of the test results as shown in Figure 2. One very serious issue that is all too common is the analysis of infiltration results in layered ground that follows the method in BRE 365. The BRE solution assumes that the infiltration out of the pit occurs evenly over the whole surface area. It is not appropriate where water only leaves the pit via a discrete stratum (figure 2a). This can underestimate the infiltration rate, leading to larger than necessary infiltration systems. However a more significant issue is where the permeable stratum is of limited extent and the ground is not suitable for soakaways, despite the test indicting it is (Figure 2b). In these cases the analysis method should be amended to take account of the strata in the test pit.
Excessive extrapolation of results where the water does not fully soak away over a working day is also an issue which generally leads to over estimation of infiltration rates (Figure 2c).

Figure 2. Issues with BRE 365 test results
There is a perception with infiltration testing that “more water and bigger pits” are better. The reason for this is the idea that soils around and below infiltration devices become saturated because of the large volumes of water entering the ground and that the bigger test takes account of the macro structure of the soil and rock and associated variations in permeability.
However, for infiltration SuDS features such as rain gardens, permeable pavements and infiltration basins there is a significant element of “interception” that occurs in the surface layers of the SuDS. This means that for the majority of rainfall events there will be no infiltration to the ground. Rainfall simply soaks into the surface layers and evaporates later.
Fully saturated conditions rarely occur in the soils around and below these types of infiltration systems. During infiltration events a field-saturated condition develops (which is not full saturation – ASTM 2016). True saturation does not occur due to entrapped air which prevents water from moving in air-filled pores. This may reduce the hydraulic conductivity in the field by as much as a factor of two compared to conditions when trapped air is not present (ASTM 2016). Field test methods should simulate the field saturated condition.
Macro structure will normally only be relevant in strata such as rock or fissured clay (and clay will not be suitable for infiltration.). The influence of macro structure or variations in permeability can be allowed for by using a greater number of smaller tests and, more importantly, by robust assessment of the ground conditions by qualified geotechnical engineers or geologists.
Good soil and rock descriptions to BS 5930: 2015 + A1: 2020 (which incorporates descriptions to BS EN ISO 14688 and 14689) are a vital part of infiltration testing. They can be used in two ways.
The first is that initial permeability assessments can be made by designers based on the soil descriptions and published permeability values.
The second is that they are required to allow designers to undertake a sense check on infiltration results, understand whether the normal analysis of the results needs to be amended (eg if all the water lost in the test has gone into a base layer of rock and all the walls are clay) and to provide information for the wider ground model.
Another important consideration is the cut and fill profile of a site. This can result in ground levels increasing or decreasing from those at the time of any site investigations. This needs to be considered when assessing the locations for infiltration tests and the design of infiltration systems.
Water companies
Water and Sewerage Companies (WaSC) are now able to adopt some SuDS including some types of infiltration system. Training to WaSC delivered by Water UK has emphasised the importance of the conceptual ground model for infiltration design and the fact that infiltration assessment is more than infiltration tests. The training also recommended that WaSC require the following to be supplied with any infiltration design:
- Reasonable assessment of geology and infiltration capacity of each stratum by a qualified geotechnical or geology professional;
- Advice from qualified geotechnical or geology professional on suitable depths and infiltration rates (with the stratum to which the rates apply identified);
- Review of final infiltration design by geotechnical or geology professional to make sure it meets the advice provided in the site investigation report; and
- Completed infiltration Checklist – SuDS Manual, Table B.6.
It also advised that there are acceptable alternatives to the BRE 365 infiltration tests such as permeability tests in boreholes.
Alternatives test and assessment methods
Is it time to reassess the use of BRE 365 and allow alternative methods of infiltration testing combined with wider assessment of the ground model? Other infiltration test methods are used successfully in other countries and there is no reason why those cannot be used in the UK. A larger number of alternative tests combined with an assessment of the overall ground model and other data will provide a much better indication of infiltration rates than a limited number of BRE tests.
The SuDS manual includes falling head tests to ISO 22282-2:2012 (completed and analysed as a test in the unsaturated zone) as an acceptable alternative to BRE365 tests. In practice they provide a reasonable alternative to testing in trial pits, providing the results are assessed in the context of the wider ground model by an experience ground engineering professional.
The borehole tests in the unsaturated zone require the ground to be pre saturated before the test, which is similar to the “test three times” approach in BBRE 365.
The AGS article in 2021 suggests that use of boreholes as a device for obtaining infiltration data is a natural ambition for AGS members seeking compliance with standards and health and safety. There is no reason why simpler and safer methods using boreholes, permeameters and ring infiltrometers cannot be used. Indeed, the design of site investigations must comply with the Construction (Design and Management) Regulations 2015. A fundamental principle of the regulations is that of elimination of hazards where possible using less hazardous alternatives. Given that there are acceptable and safer methods of infiltration testing than BRE tests then a site investigation designer is legally obliged to use the alternatives. This should be recognised by LLFAs and Water Companies.
Boreholes tests have been used successfully to assess infiltration rates for retrofit SuDS in streets where BRE tests are not practical.
For permeable paving and infiltration basins the head of water in the infiltration test should be kept low and therefore the use of the alternative methods is more suitable and reliable, which will removes the hazards associated with infiltration tests in deep trial pits.
Existing standards that may be used as guidance are:
- BS EN ISO 22282-5:2012 Geotechnical investigation and testing – Geohydraulic testing – Part 5: Infiltrometer tests), which describes various types of ring infiltrometer test; single or double ring, open and closed. These are used in other countries to assess infiltration from shallow SuDS features such as infiltration basins, permeable pavements and rain gardens (see below). They are generally suitable for testing at shallow depths and would need to be undertaken at the base of a stable and safe pit.
- ISO 22282-2:2012 Geotechnical investigation and testing – Geohydraulic testing – Part 2: Water permeability tests in a borehole using open systems. The ground around the well should be pre saturated and the results analysed as a test in the unsaturated zone. These can be undertaken to any reasonably expected depth for an infiltration device
- ASTM D5126-16 Standard guide for comparison of field methods for determining hydraulic conductivity in vadose zone. Permeameters can be used in boreholes with the common diameters typical of UK site investigations and some are available that can test at depths that can be reasonably expected for infiltration devices.
A summary of examples of infiltration testing used in various countries is provided in Table 1. It is of particular interest that the Scottish Building Standards already allow the use of constant head permeameter tests. There is no justifiable reason why this cannot also apply in the rest of the UK.
In summary all other countries determine infiltration rates using borehole, permeameter or infiltrometer tests.
When should infiltration testing be used?
A further issue is the unreasonable and unnecessary requirement from many LLFAs for infiltration tests to be completed to show that a site is not suitable for infiltration. On many sites it is often not necessary to fill a trial pit with water and sit watching it go nowhere for eight hours, just to show infiltration is not possible. A robust desk based assessment of the geology and ground conditions by a suitably qualified ground engineering professional can often be sufficient to show that infiltration is not viable. At the site investigation stage if the ground below the site is shown to comprise low permeability strata such as clay there should be no need for tests to show infiltration is not viable.
From a health and safety perspective not requiring infiltration tests in the first place, where they are not necessary is a good step forward (and follows the accepted CDM hierarchy that the first option to be chosen should be to eliminate the hazard by design if possible).
However, the consultant involved should provide a site specific, robust and well reasoned argument why infiltration is not possible. Examples of situation where this may apply are:
- Some (not all) sites where ground contamination is present. An example could be where residual hydrocarbon contamination is present that could be mobilised by infiltration drainage. Another example is where a development is located over old landfill material.
- Sites underlain by a significant thickness of clay that does not include more permeable layers (eg Lias Clay in some parts of Northamptonshire).

Permeametre tests
Constant or falling head permeameter tests can be undertaken over the same depths that BRE365 tests are normally completed. The tests are completed in boreholes which can be drilled by hand or power auger, windowless samplers, cable percussion, etc. More than one test at different depths may be necessary in layered soils (Gill et al 2023).
The test requires significantly less water than a BRE test and is more practical.
Various permeameters are available. The Guelph permeameter and similar instruments maintain a constant head of water above the bottom of the hole and rate of water flow into the soil is recorded at short intervals until it reaches a steady state. The field saturated hydraulic conductivity (Kfs) of the soil can then be calculated (Amoozegar 2020). Falling head instruments repeat falling head tests over a short length until a steady state is reached.
A photo of a permeameter is provided in Figure 3. Advantages of using permeameters are:
- The test equipment is relatively lightweight / easy to set up;
- Small volumes of water are required for each test; and
- Tests can be undertaken during drilling or windowless sampling or can undertaken separately from the main site investigation in auger holes, depending on required depth.

Figure 3. Permeameter (EPG Ltd)
A study by Bockhorn et al (2014) compared the infiltration rates obtained using a double ring infiltrometer, a Guelph permeameter and a trial pit test. Details of the tests are shown in Figure 4. All the tests were in Glacial Till comprising clay.

Figure 4. Comparison of saturated hydraulic conductivity from various tests (redrawn after Bockhorn et al 2014)
The trial pit tests were not repeated three times as per BRE 365. The pits were filled with water until a steady state outflow was attained and the infiltration recorded. The time to achieve this is not stated. The infiltrometer gave the lowest results followed by the Guelph permeameter and the highest results were from the infiltration pit. Two of the permeameter tests gave no infiltration at all which may have been due to compaction of the soils by machinery or just inherent variations in the Till across the site.
The possible reasons for the trends observed were considered to be smearing on the sides of the hole, compaction of the soils close to the surface and the fact that the pit would include infiltration via fissures in the clay and variations in soil grading.
However, it was also considered that the pit had not fully saturated the ground around it whereas the infiltrometer and permeameter tests had. It is known that typically in a BRE 365 tests the infiltration rate reduces from initial to third repeat of the test, typically by one order of magnitude. This would make the pit test results comparable to the Guelph permeameter results.
The infiltration rate of soils can show spatial variability due to the inherent heterogeneity. However this can be managed by using a suitable number of tests. The authors concluded that use of infiltrometer or permeameter tests alone would not provide a reliable indicator of infiltration rates. They concluded that data from pits gave more representative results but that the pits are highly invasive. However probably the most significant reason for the variations that was not discussed is the limited number of pits (four) in one area of the site compared to the number of permeameter and infiltrometer tests (19 and 18 respectively spread over a much wider area of the site).
The authors concluded that the most appropriate infiltration test method was to use the tests in conjunction with borehole soil descriptions and geological assessment of the ground. This requirement already applies to BRE365 tests (but is often not followed). Given the small difference between the permeameter tests and the pit tests and also accounting for saturation, it is considered that the results show that a larger number of permeameter tests and a robust assessment of ground conditions by a ground engineering professional is a reasonable alternative to BRE 365 tests. In any event, as discussed earlier, even BRE tests should be accompanied by a robust assessment of ground conditions.
The Irish Environmental Protection Agency (EPA – Government of Ireland, 2023) has conducted research on alternatives to percolation tests for waste water infiltration systems. The research included a comprehensive literature review of soil
permeability testing and design standards for onsite waste water treatment systems. The study involved assessment of a database of falling head tests in pits (over 900 tests), modelling and field tests to compare the different methods at 17 sites. In summary it was conclude that falling head infiltration tests in pits (a version of the BRE365 test, but in smaller pits) is not an ideal method and should be replaced. Constant head tests using permeameters are considered more reliable and practicable. It also emphasised that international guidance indicates that insitu permeability tests should only be used as a complement to detailed site assessments. Permeability test results should not be the main factor in assessing suitability for infiltration and there is a need for the results of the tests to be placed in the context of an accompanying assessment of the soil texture and structure.
Conclusion
The BRE 365 infiltration test has significant health and safety, practicality and sustainability issues. There are suitable alternative methods that are used by some in the UK and that are also widely used in other countries. Large scale pit infiltration tests are rarely, if ever, used in other countries to determine infiltration rates for SuDS.
The key to successful infiltration testing and design is to include a suitably qualified ground engineering professional in the SuDS design team to advise on the appropriate test methods and to interpret the results. They should also review the final design with reference to the site ground model.
The way forward to support a sustainable agenda, reduce waste of valuable natural resources and improve health and safety is to:
- Promote wider use of understanding ground models at the initial design stage and not to preferentially rely on limited study and a small data set of BRE365 infiltration tests.
- Avoid doing infiltration tests where the desk study information and preliminary assessment shows it is not viable (from a CDM perspective design out the hazard, which should be the priority);
- Use borehole, permeameter or infiltrometer tests as appropriate, if possible (design out the hazard from the testing).
- Even for larger systems consider the use of a greater number of borehole tests rather than limited BRE tests. Consider the benefits of a good geological characterisation and what benefits could be gained from having high quality data rather than the adoption of worst-case values because of limited data.
- Only use BRE tests when absolutely necessary and infill the pit with gravel to remove the hazard. Use data loggers for water level recording.
Furthermore, the analysis of infiltration test results should not blindly follow the assessment in BRE 365. If layered soils are present where water preferentially infiltrates into one layer this should be allowed for and stated. Infiltration test results should state which stratum they are applicable to. The tests should also be related to an ordnance datum level so that designers can take account of changes in ground level due to cut and fill.
References
- AGS (2021) AGS magazine October/November 2021, What is a pragmatic and safe approach to assessing the feasibility and design of infiltration systems on a site?
- AGS (2024) AGS magazine March 2024, Calibration of BRE365 soakaway testing; discussion on safety and alternatives.
- Amoozegar, A., 2020. Examination of models for determining saturated hydraulic conductivity by the constant head well permeameter method. Soil Tillage Res. 200, 104572.
- ASTM (2016) Standard guide for comparison of field methods for determining hydraulic conductivity in vadose zone ASTM D5126-16
- Bockhorn, B., Jensen, M. B., & Klint, K. E. S. (2014). Stormwater management: Methods for measuring near- surface infiltration capacity in clayey till. Geological Survey of Denmark and Greenland Bulletin (GEUS), 28(31), 47-50 Open access: www.geus.dk/publications/bull, Attribution 4.0 International licence (CC BY 4.0). https://creativecommons.org/licenses/by/4.0/
- BRE (1991) Soakaway design. Digest 365.
- BRE (2016) Soakaway design. DG 365, February 2016.
- British Standard BS5930: 2015 +A1: 2020 Code of practice for ground investigations
- British Standard BS EN ISO 14688-1: 2018 Geotechnical investigation and testing. Identification and classification of soil – Identification and description
- British Standard BS EN ISO 14689: 2017 Geotechnical investigation and testing — Identification, description and classification of rock
- CIRIA (1996) Infiltration drainage – manual of good practice. Report R156.
- CIRIA (2015) The SuDS Manual, CIRIA C753. http://www.legslation.gov.uk/ukpga/1991/56/contents
- Jonasson S A (1984) Dimensioning Methods for Stormwater Infiltration Systems. In Balmer P, Malqvist P A and Sjoberg A (Eds) Proc 3rd int Conf on Urban Storm Drainage, Chalmers Uni of Tech, Sweden.
- Gill LW, Mac Mahon J, Knappe J, Morrissey P (2023) Hydraulic conductivity assessment of falling head percolation tests used for the design of on-site wastewater treatment systems. Water Research 23
- Government of Ireland (2023). Percolation testing of soils for on-site wastewater treatment. EPA Research Report 2019-W-DS-35 Prepared for the Environmental Protection Agency by Trinity College Dublin.
- Soil Moisture Equipment Company (2012), Guelph Permeameter Operating Instructions, December 2012.
Thought leadership article authored by Ian Price, Associate at Environmental Protection Group.

Introduction
BS 8102:2022 identifies three types of structural waterproofing: Type A (barrier or membrane protection), Type B (structurally integral systems, typically using watertight concrete), and Type C (internal cavity drainage systems). For basements requiring a Grade 3 (habitable) environment, two lines of defence are typically specified, usually a combination of Type A and B, or Type B and C, where the choice is between Type A or C for the secondary system. There has been a marked industry shift toward Type C systems in basement construction in recent years. While Type C solutions are effective when correctly designed, installed, and maintained, this growing preference appears driven more by construction convenience than long-term client benefit. The challenge is balancing what works best for the program and buildability with what serves the structure best over its lifetime.

The Appeal of Type C for Contractors
Contractors increasingly favour Type C systems for their flexibility and sequencing advantages. These systems can be installed after the structural shell is complete, which reduces coordination issues during the early build stages. They require minimal substrate preparation, which helps streamline the program, and are more tolerant of minor installation defects that typically do not lead to water ingress, unlike Type A systems, where such defects can be critical.
Furthermore, Type C systems are not reliant on dry weather conditions. As the structural shell is typically complete before installation begins, the work is usually carried out under cover. This makes Type C particularly appealing from a programming perspective, helping to avoid delays and ensuring progress can continue during the winter months.
Why Type A Is Often Better for the Client
Despite its installation demands, Type A waterproofing is a robust and often more appropriate solution from a long-term performance perspective.
Firstly, Type A systems protect the reinforcement in concrete by preventing water ingress, enhancing the durability of the structure. They also act as a barrier to contaminants and harmful ground gases such as radon, carbon dioxide and methane.
Unlike Type C systems, which rely on pumps requiring replacement every 10 years and annual maintenance to prevent blockage from free lime deposits, Type A systems are passive once installed and correctly detailed. While Type C is often the most cost-effective option during construction, the long-term maintenance cost is rarely considered. Over a typical 50-year design life, maintenance costs can run into tens of thousands of pounds.
Furthermore, Type C systems require the client to obtain annual discharge licenses for water pumped from the system. This adds an administrative burden and ongoing costs typically not factored into the initial construction budget.
Type C systems can be impractical for large developments with complex foundation details. Details such as intermediate slabs on two storey basements, column penetrations, or slip-formed lift cores adjacent to retaining walls (common in cut-and-carve projects) can compromise the continuity and effectiveness of internal drainage membranes.
Other limitations include achieving the required 150mm termination above external ground level. Since the ground floor slab typically sits below this level, this is normally achieved with additional external membrane work. Type C systems also rely on sufficient water to direct water toward sumps and outlets; however, in many cases, the system experiences minimal water ingress, which can lead to stagnant water over the building’s lifetime.
Finally, some waterproofing contractors will only install the cavity membrane once the basement is demonstrably dry, meaning that the Type C system is either underused or not engaged at all during most of the building’s life. This raises questions about its long-term value and appropriateness for certain applications.

The Practical Challenges of Type A
Type A systems require careful planning and execution. Installers must be on-site at various stages of the build, usually to install beneath the slab, behind retaining walls, and at termination details. These visits may be broken down into multiple sub-visits, depending on the complexity of the detailing.
Type A systems are less forgiving, as minor errors in detailing or workmanship can lead to water ingress. In high-risk areas, such as the underside of capping beams, construction joints, or termination details, membrane defects can coincide with structural issues like honeycombing, cracks, or voids, resulting in water penetration. Additionally, when the membrane is installed below the slab, contractors must take care to avoid damage from reinforcement. The substrate can also be difficult to work over, as it can become slippery when wet.
Type A membranes also require skilled labour, either approved contractors or installers trained by the product manufacturer. The installation requires more time, greater attention to detail, and suitable weather conditions. These factors are challenging to overcome on live construction sites, which is why some contractors avoid them.
However, these are not reasons to disregard Type A systems. Instead, they highlight the need for proper planning and site preparation, challenges that are manageable through good construction practices, as BS 8102:2022 suggests.
Striking a Balance
While buildability is a crucial factor in design development, it should not come at the expense of quality and suitability. Designers and clients should be more assertive in resisting convenience-led design decisions that may not serve the project in the long term.
Independent waterproofing specialists should be engaged from the design stage to ensure that solutions are appropriate for the structure and end user, not just for site convenience. When the waterproofing design is supplier or installer-led and provided as a complimentary service, there is a risk that design decisions may be influenced by commercial reasons. This can lead to designs that technically comply with BS 8102:2022 but aren’t necessarily the best option for the client.
Contractors may favour short-term program efficiency, but a more holistic approach considering design-life should be encouraged. Proper training and planning make Type A systems the most robust solution. In most cases, failures in Type A waterproofing are not due to flaws in the system itself, but in the quality of execution.
Conclusion
Type A waterproofing should not be dismissed solely because of installation complexity. Design decisions must be based on what is best for the structure over its lifespan, not just on construction convenience or build cost.
As independent waterproofing designers, we advocate for technical solutions that serve the long-term performance of the structure, not just the short-term needs of the contractor’s program. Type A may be more demanding to install, but it delivers better long-term value and protection for the client when executed correctly.
Thought leadership article authored by Ian Price, Associate at Environmental Protection Group.

Introduction
BS 8102:2022 identifies three types of structural waterproofing: Type A (barrier or membrane protection), Type B (structurally integral systems, typically using watertight concrete), and Type C (internal cavity drainage systems). For basements requiring a Grade 3 (habitable) environment, two lines of defence are typically specified, usually a combination of Type A and B, or Type B and C, where the choice is between Type A or C for the secondary system. There has been a marked industry shift toward Type C systems in basement construction in recent years. While Type C solutions are effective when correctly designed, installed, and maintained, this growing preference appears driven more by construction convenience than long-term client benefit. The challenge is balancing what works best for the program and buildability with what serves the structure best over its lifetime.

The Appeal of Type C for Contractors
Contractors increasingly favour Type C systems for their flexibility and sequencing advantages. These systems can be installed after the structural shell is complete, which reduces coordination issues during the early build stages. They require minimal substrate preparation, which helps streamline the program, and are more tolerant of minor installation defects that typically do not lead to water ingress, unlike Type A systems, where such defects can be critical.
Furthermore, Type C systems are not reliant on dry weather conditions. As the structural shell is typically complete before installation begins, the work is usually carried out under cover. This makes Type C particularly appealing from a programming perspective, helping to avoid delays and ensuring progress can continue during the winter months.
Why Type A Is Often Better for the Client
Despite its installation demands, Type A waterproofing is a robust and often more appropriate solution from a long-term performance perspective.
Firstly, Type A systems protect the reinforcement in concrete by preventing water ingress, enhancing the durability of the structure. They also act as a barrier to contaminants and harmful ground gases such as radon, carbon dioxide and methane.
Unlike Type C systems, which rely on pumps requiring replacement every 10 years and annual maintenance to prevent blockage from free lime deposits, Type A systems are passive once installed and correctly detailed. While Type C is often the most cost-effective option during construction, the long-term maintenance cost is rarely considered. Over a typical 50-year design life, maintenance costs can run into tens of thousands of pounds.
Furthermore, Type C systems require the client to obtain annual discharge licenses for water pumped from the system. This adds an administrative burden and ongoing costs typically not factored into the initial construction budget.
Type C systems can be impractical for large developments with complex foundation details. Details such as intermediate slabs on two storey basements, column penetrations, or slip-formed lift cores adjacent to retaining walls (common in cut-and-carve projects) can compromise the continuity and effectiveness of internal drainage membranes.
Other limitations include achieving the required 150mm termination above external ground level. Since the ground floor slab typically sits below this level, this is normally achieved with additional external membrane work. Type C systems also rely on sufficient water to direct water toward sumps and outlets; however, in many cases, the system experiences minimal water ingress, which can lead to stagnant water over the building’s lifetime.
Finally, some waterproofing contractors will only install the cavity membrane once the basement is demonstrably dry, meaning that the Type C system is either underused or not engaged at all during most of the building’s life. This raises questions about its long-term value and appropriateness for certain applications.

The Practical Challenges of Type A
Type A systems require careful planning and execution. Installers must be on-site at various stages of the build, usually to install beneath the slab, behind retaining walls, and at termination details. These visits may be broken down into multiple sub-visits, depending on the complexity of the detailing.
Type A systems are less forgiving, as minor errors in detailing or workmanship can lead to water ingress. In high-risk areas, such as the underside of capping beams, construction joints, or termination details, membrane defects can coincide with structural issues like honeycombing, cracks, or voids, resulting in water penetration. Additionally, when the membrane is installed below the slab, contractors must take care to avoid damage from reinforcement. The substrate can also be difficult to work over, as it can become slippery when wet.
Type A membranes also require skilled labour, either approved contractors or installers trained by the product manufacturer. The installation requires more time, greater attention to detail, and suitable weather conditions. These factors are challenging to overcome on live construction sites, which is why some contractors avoid them.
However, these are not reasons to disregard Type A systems. Instead, they highlight the need for proper planning and site preparation, challenges that are manageable through good construction practices, as BS 8102:2022 suggests.
Are there other ways to assess infiltration that have fewer health and safety risks and a lower environmental impact? Afterall, determining infiltration rates is more than pouring water into a hole.
Health and safety is paramount, where risks can be removed, it is our duty to do so. Heavy plant digging holes is a high-risk activity.BRE365 tests are intensive, using heavy machinery and virgin aggregate. They can take significant time to complete, especially in lower permeability geology, potentially slowing progress on projects.
Addressing concerns from the BRE365 test method, we are looking at how infiltration is assessed.
Driving the industry forward in a pragmatic way, we think it’s vital to question and review set guidance and push for updated testing to be considered.
In the latest document with Susdrain, Steve Wilson and Jacqueline Diaz-Nieto discuss the alternatives to BRE 365 infiltration in collaboration with Susdrain.
Read the full article here: infiltration rates for SuDS: is it time to ditch BRE 365 tests?
If you would like to find out more about alternatives to BRE 365 infiltration and the options EPG can provide, please speak to Leo Phillips, Head of Commercial and he’ll be able to help – leo.phillips@epg-ltd.co.uk
SuDS in schools – is conventional drainage alone a thing of the past?
Extreme flooding across the UK is something that people are experiencing with increasing regularity, and schools and education authorities are looking for cost effective, long-term solutions which can keep children safe, and avoid closures from these weather events.
Sustainable drainage systems, commonly known as SuDS, are designed to slow the flow of water and mimic nature’s defences. Unlike conventional drainage which directs water underground, SuDS keep the water on the surface and manage water where it falls. Future generations will need to look practically at how water is managed in urban and rural environments, as conventional drainage is creaking under the pressure of increased rainfall associated with climate change and increased urbanisation. SuDS address these issues through blue green design and provide a positive solution in combating climate change.
From recent storm events, schools have been forced to close due to extreme conditions and with having aging infrastructure in place to combat the quantity of water on site.
Funding is available to schools through the DfE website to encourage retrofit SuDS on sites which is recognised as a highly effective way of reducing surface water flooding following the PIT review and Flood and Water Management Act 2010. Natural disasters, flooding and the climate is part of the school curriculum and schools are taking responsibility for their own water management.
What are the benefits of SuDS in schools?
- Landscape legibility and enhance education opportunities
This is where pupils learn to read the landscape they’re observing and understand the flow of water. SuDS bring the curriculum to life by bringing water and biodiversity into the centre of the school and educate pupils so that they have a clear understanding of where the water is meant to go, banishing any misconceptions and raising awareness within the whole community.
- Holistic sustainability
Following the management train approach as demonstrated in the SuDS manual promotes the incorporation of source control techniques to collect, treat, store and control runoff prior to discharge, and improve the biodiversity in the area. By having a space for plants, this creates a nicer environment and helps bring down the temperature in the area. Planters and rain gardens bring the water cycle to life, as a reservoir is available for the plants to drink, and with the correct soil allows the plants to access water without the need for hosepipes, saving costs as well as creating a sustainable environment.
Blue green approaches encourage evapotranspiration and mitigates against the urban heat island effect.
- Maintenance
When water is kept on the surface, we know when it is at its capacity. The visible nature of SuDS means that it is apparent when it needs an outlet, avoiding unexpected problems. Maintaining SuDS is routine work and involves clearing leaves, pruning plants and is a great way to involving pupils. It is hugely beneficial and educational, and less costly to manage.
Phil Williams, Director at the Environmental Protection Group stated, “We have been working alongside schools for over 15 years implementing sustainable drainage designs across the UK, both new and retrofit. The joy it brings to the community is something we’re always thrilled to see, and if we can continue to mitigate the impact of flooding with natural flood management, we should start to see positive changes for our environment.”
The technicalities – how using the right suppliers gets you the right results
Simpler stakeholder engagement
Stakeholder engagement and good consultation is the key to avoiding misconceptions and banishing myths surrounding SuDS. The opportunity to incorporate SuDS in a project should be met with excitement. For planners, architects and engineers, it is their job to communicate and showcase how this vision will become a reality. Dealing with one stakeholder allows for a smooth, simple scheme delivery.
Collaboration
Co-design between landscape architects, SuDS designers, engineers and the schools is important to ensure engagement in the project and understanding. For the very best results, landscape architects need to work in harmony with engineers and then the contractors. With landscape architects working on the aesthetics and visuals alongside the school, the engineers are left to determine the flow rates and quantification of the impact the SuDS features will have for funders and authorities.
Safety
Safety considerations for any project is vital, however it’s important to recognise that for most of the time, SuDS feature will have no water in them, and when raining, only hold a small amount of water, usually between 100ml-300ml. This means no danger for pupils and simply becomes a learning aid. SuDS also work at removing pollutants and sediment from a water flow, all powered by nature.
Take a look at the video below to see how a school in Estcourt School in Hull put this into practice.
The Environmental Protection Group (EPG) co-authored the SuDS manual and is passionate about designing projects which can enrich people’s lives and their surrounding environments for the future. The introduction of SuDS in an area brings enhanced biodiversity, amenity, improves water quality and reduces water quantity. Conventional drainage can’t provide amenity or biodiversity to any area so sustainable measures should be implemented where possible.
Let’s design with nature in mind.
Greening Brownfields: Unlocking the potential for SuDS on brownfield land
This International Women’s Day we are celebrating the inspirational women that contribute to our success. Leading the way are the heads of our Water and Geoenvironmental teams, Jacqueline Diaz-Nieto and Amy Juden, who share their collaborative thoughts on the potential for SuDS to be used on brownfield sites.
With a housing crisis that shows no sign of slowing, coupled with a desire to conserve our dwindling green spaces, there is a renewed push to find development space on brownfield land. The regulative landscape will soon see the introduction of Schedule 3 which means the industry will need to consider using sustainable drainage systems (SuDS) on every development site.
Using sustainable drainage systems on brownfield land brings advantages. Sustainable drainage systems can be designed to complement the ground conditions and constraints and bring multiple additional benefits to a project; greening brownfield sites. The wide-ranging positives of this approach shouldn’t be underestimated.
Schedule 3 requires designers to consider SuDS within a hierarchy that prioritises discharging surface water to ground, and with SuDS also serving a dual purpose of satisfying the Biodiversity Net Gain (BNG) requirements, making SuDS work on brownfield sites makes financial and environmental sense and will ensure compliance with new requirements.
Resistance may exist against infiltration drainage on potentially contaminated sites. It is true that infiltrating water has the potential to mobilise soil contaminants and subsequently pollute rivers and groundwater, however, depending on the contaminants and their leachability (mobility in water), infiltration could be acceptable if properly assessed and designed. This is especially true for diffuse infiltration limited to pre-development rates, which is likely to be suitable on all but the most severely contaminated development sites. Concentrated soak-away drainage might not be suitable through made ground or contaminated materials, but it may still be possible to locate these to discharge at slightly greater depth into natural ground, or on a less contaminated part of the site. Even on development sites where leachable contamination has been identified it may be possible to plan the remediation strategy such that these soils are relocated to less sensitive areas or capped by hard surfacing.
Even on highly contaminated sites, SuDS designed not to infiltrate can bring significant advantages, and shouldn’t be ruled out. Waste disposal costs for contaminated soil, particularly if classed as hazardous can be a significant cost to development. Keeping drainage systems shallow and designing out deep drainage and large attenuation tanks can reduce the associated excavation and removal costs, particularly relevant for contaminated ground. Shallow water storage used in SuDS could include gravel layers or geocellular crates under permeable paving or lined landscaping features. These solutions can come into their own for redevelopment of former landfill sites, where not only is excavation and soil disposal costly, it may also come with specific environmental permitting requirements. With wait times for some bespoke environmental permit decisions extending over 24 months, this is not an appealing option for developers or contractors, and SuDS may provide the solution!
SuDS champions often talk about the four pillars of good SuDS being the design for quantity, quality, amenity and biodiversity. Whilst often overlooked by traditional drainage designers, the potential amenity and biodiversity benefits of SuDS on brownfield land is huge and can strengthen the case for making SuDS work on brownfield land. Well-designed SuDS not only provide the hydraulic attenuation requirements to achieve greenfield runoff rates, reducing the risk of flooding downstream, but vegetated SuDS (with the shallow attenuation below ground) provide much-desired urban greening, they also bring a myriad of other social and environmental benefits.
SuDS sells! SuDS provide multiple landscape and biodiversity benefits, making new developments an attractive place to be as well as providing amenity and social value along with the economic advantages of rejuvenating an area. Together these factors make developments much more desirable. This is particularly pertinent when a site was previously derelict, unused, or unloved. Getting SuDS onto your brownfield sites is literally turning brown to green!
Success in these designs depends on understanding the ground model, specific constraints in the ground from previous uses, levels of contamination and the pathways for contaminant migration. Drainage designs for brownfield sites therefore benefit massively from the input of geoenvironmental professionals from the start. Experts who understand all aspects and can advise SuDS designers on safe working depths for the SuDS attenuation layer and specify from the start whether leaky SuDS can be designed, busting the popular myth that SuDS on brownfield sites must be tanked.
At EPG, our combined skills and experience in drainage design, ground conditions and land contamination allows us to unlock the potential benefits of SuDS on brownfield sites and provide clients with a one-stop shop.
Our dynamic team is changing the narrative around holistic environmental designs for challenging sites. Don’t believe anyone who tells you that you can’t infiltrate on brownfield land. Challenge any design that includes a deep-dig through contaminated ground for a large attenuation tank. Get in touch with EPG to see if we can do better and provide you with a more cost-effective, greener design using our innovative approach.
The climate emergency is not up for debate, it is here and brings with it serious negative impacts. Climate change is caused by greenhouse gases generated from a range of human activities – energy production, transport, industry and producing food – entering the atmosphere and warming the planet. The construction industry contributes 39% of global carbon emissions. Everyone involved in the industry has a role to play in reducing this number. We caught up with Amy Juden, a Ground Contamination Consultant for EPG, to capture her thoughts on the role of risk assessments in producing lower carbon developments.
The death rate for the climate emergency has previously been estimated at around 300,000 per year (Global Humanitarian Forum, Human Impact Report, 2009) and is continuing to rise. As contaminated land risk assessors, we deal with minimal risk thresholds for excess deaths related to toxic chemicals. The harm being done by climate change is on a much larger scale.
Recent studies have introduced a new concept – the carbon cost of a life. A recent study by Bressler, published in Nature concludes: adding 4,434 metric tons of carbon dioxide in 2020—equivalent to the lifetime emissions of 3.5 average Americans – causes one excess death globally in expectation between 2020-2100.
However, this estimate only takes into account direct temperature-related deaths, whereas climate change can also lead to other deadly environmental and related social disasters resulting in excess deaths, such as flooding, wildfires, crop failures, conflict, and mass migration. So, it is likely to be a significant underestimation.
Another ‘back of the envelope’ calculation by Mike Berners-Lee in his book “How bad are bananas?”, estimates the carbon cost of a life to be as low as 150 tonnes. Given that my personal carbon footprint per year is around 15 tonnes, by this measure my emissions could be leading to a climate-related death every 10 years. The true number is likely to be somewhere between 150 and 4,400 tonnes, perhaps a few hundred tonnes.
Remediation works are necessary for some brownfield sites to make them safe and suitable for development, but all remedial interventions have a carbon cost. However, most carbon calculators available for construction activities only focus on the structure and are not designed to calculate the impact of ground works, excavations, remedial interventions, and treatments. Nevertheless, some companies are developing their own internal tools to do this, such as the Leap CReDiT tool for soil cover layers and foundations, and carbon calculators used by SoilFix. Recent discussions at the 2023 SiLC annual forum highlighted the importance of these calculations – you can’t manage what you don’t measure, and the need for standardisation of such tools.

As contaminated land risk assessors and designers, we have the greatest opportunity to minimise the carbon impact of developments on brownfield land. Similar to the waste hierarchy we learned at primary school, where the first priority is to Reduce, then Reuse, then Recycle, when it comes to remediation, the most sustainable option is often to do nothing. Better conceptualisation of a site and using detailed quantitative risk assessment (DQRA) can make this possible, but these tools are underutilised. Over-conservative assessments lead to over-engineered designs and unnecessary remediation works, contributing to the significant embodied carbon in the construction industry.
It should be considered environmentally irresponsible to specify remediation on the basis of a generic screening approach alone, without considering further assessment that could lead to a reduction in remediation. Remediation should not be used as a substitute for adequate investigation and assessment.
Most of the rhetoric and guidance/publications on sustainability in contaminated land to date (i.e. that produced by the CL:AIRE Sustainable Remediation Forum SuRF-UK) focuses on methods to minimise operational carbon emissions during remediation works. However, I argue that we could have a more significant impact on the carbon budget of a project if we consider the carbon impact earlier in the process and eliminate unnecessary remediation at the risk assessment stage.
As risk assessors and designers, we have a responsibility to design out carbon from our development projects wherever possible, in the same way that we have a duty to design out health and safety risks under CDM.
If climate change is causing deaths now at a rate of a few hundred tonnes of carbon dioxide per death, are our frameworks for assessing risk from contaminated land fit for purpose? Do we need to rethink the precautionary principles on which we operate? It also depends on people’s attitudes to risk. Perhaps climate change is so well-known and accepted in society now that we accept the fact that people all over the world are dying in climate related natural disasters. Our appetite for health risks associated with ground contamination (i.e. toxins in our garden soils, or carcinogenic vapours in our homes or workplaces) may be different.
Never-the-less there is far more that can be done within the existing frameworks and acceptable minimal risk levels. Remediation is being over specified on the basis of theoretical risks that are poorly determined.
In summary, as contaminated land risk assessors and designers, we have the power to minimise the carbon impact of developments on brownfield land. The most efficient way to do this is by intervening early. This means that before considering remediation, we should better conceptualise a site and use DQRA to determine if no action is the most sustainable option.
This is the approach that is always taken at EPG. We pride ourselves on delivering the most sustainable solution for a site, and are never afraid of offering an innovative assessment or bespoke approach to get there. This can have the added benefit of saving our clients significant sums of money in the construction phase.
But what will the future of contaminated land assessment look like in the context of climate destruction and the race to net zero? Should we incorporate the carbon cost of a human life into a new holistic framework for construction and remediation on brownfield land that considers the need for development and remedial intervention against the actual human cost? By changing the narrative and talking about carbon footprints in terms of death rates, we can increase awareness of the urgency of the climate crisis and the need to transition to net zero as quickly as possible.
Improving standards in contaminated land risk assessment through increased use of DQRA, education and training, and new targeted research, will allow for a reduction in the carbon footprint of our industry. As well as saving money on development projects. Development of standardised tools for measuring the carbon impact of remediation works, will allow us to manage this effectively. And incorporation of the concept of the “carbon cost of a life” would allow for comparison of carbon budgets, with human health risks.
Better risk assessment is integral to reducing carbon emissions in remediation of brownfield land. Let us work together to create a more sustainable and resilient future for all.